Break-even analysis or cost value profit analysis
The main objective is to find the cut-off production volume from where a firm will make profit.
The total sales revenue of the firm is
Break-even analysis or cost value profit analysis
Elements of cost
Law of demand and supply
Methods to control pollution in thermal and nuclear power plant
Site selection of nuclear power station, Thermal power plant,Hydro power plant
Methods of nuclear waste disposal
Load curve & load duration curve
Objective and types of tariff
Geothermal power plant
Tidal power plant
Solar thermal power plant
Hydro-electric power plant
Wind electric system
Fast breeder reactor & Gas cooled reactor
Boiling water reactor (BWR)
Pressurized water reactor (PWR)
Liquid metal cooled nuclear reactor
CANDU type reactor
Diesel engine power plant
Nuclear power plant